AI Networking Industry Explained: The U.S. View
An AI cluster is only as fast as the network linking its accelerators. Training a large model means thousands of chips exchanging data constantly, so switches, switch chips, cables and optics have become a major part of AI spending. Networks work at three levels: scale-up connects accelerators inside a rack, scale-out connects racks across a cluster, and scale-across links whole data centers. U.S. companies lead the chain. Broadcom, which designs switch chips and custom AI accelerators, reported AI semiconductor revenue of $16.7 billion in the quarter to August 2, 2026, up 221%, and expects $21.7 billion the next quarter. Arista, which builds Ethernet switches, passed $3 billion in quarterly revenue for the first time in the second quarter of 2026, up 37.7%, and guided about $3.3 billion next. Nvidia sells its own networking alongside its accelerators. Speeds are moving to 1.6 terabits per second per port, and power use is becoming a design limit, pushing new approaches such as linear and co-packaged optics.
- Broadcom
- AI semiconductor revenue $16.7B in the quarter to Aug 2, 2026, up 221%
- Arista
- Q2 2026 revenue $3.04B, up 37.7%, its first quarter above $3B
- Speed
- Arista introduced 1.6 Tbps AI fabric platforms in 2026
How the chain works
Scale-up, scale-out and scale-across
| Scale-up | Scale-out | Scale-across | |
|---|---|---|---|
| Connects | Accelerators in a rack | Racks in a cluster | Clusters in different buildings or sites |
| Distance | Shortest; copper common | Longer; optics common | Longest; optics |
| 2026 signal | Arista offers liquid-cooled scale-up options | Arista Etherlink switches up to 100 Tbps | Arista outlines scale-across designs |
| What to watch | Open standards vs proprietary links | 1.6T port adoption | Multi-site AI training |
Why the network matters for AI
In AI training, accelerators split the work and constantly share results. If the network is slow, expensive chips sit idle. That makes switches and links a large part of AI cluster budgets, and the network design determines how big a cluster can usefully grow.
Arista's chief executive Jayshree Ullal described customers as now seeing "networking as the central nervous system for infrastructure." In its second-quarter 2026 release Arista outlined designs for scale-up, scale-out and scale-across networks, a multi-planar leaf-spine layout, and an open protocol, Multipath Reliable Connection, to keep large AI clusters busy.
Silicon: custom chips and switch chips
Broadcom sits at the center of the chain because it designs both switch chips and custom AI accelerators for cloud companies. In its fiscal third quarter ended August 2, 2026, Broadcom's revenue rose 86% to $29.6 billion, and AI semiconductor revenue rose 221% to $16.7 billion, which it attributed to very strong demand for custom AI accelerators and networking. It guided fourth-quarter AI semiconductor revenue to $21.7 billion, up 236%.
Nvidia sells networking as part of its AI platforms. Its Vera Rubin platform, in full production by August 2026, includes Spectrum-6 switches that support both pluggable and co-packaged optics.
Systems: Ethernet switches and power
Arista reported second-quarter 2026 revenue of $3.036 billion, up 37.7% from a year earlier and 12.1% from the first quarter, with a GAAP gross margin of 62.9%, and guided about $3.3 billion for the third quarter. Its 7060XE7 Etherlink switches offer up to 100 Tbps of system bandwidth, and it introduced 1.6 Tbps AI platforms, including liquid-cooled options.
Power is now a design limit. Arista says its linear pluggable optics cut interconnect power by about 60% compared with traditional pluggables. Every watt saved in the network is a watt available for accelerators in a power-constrained data center.
How the U.S. view differs from the China view
The Chinese version of this page looks at the components China makes for AI networks, such as copper cables, connectors and optical modules, and at Chinese switch makers building domestic AI clusters with locally available chips.
From the U.S. side the high-value pieces, switch silicon, custom accelerators and switch systems, are mostly American. The competition is among U.S. approaches: open Ethernet-based designs versus proprietary platforms bundled with accelerators.
2026: networking grows faster than ever
As AI clusters grew in 2026, networking spending grew with them. Broadcom's AI semiconductor revenue more than tripled year on year, and Arista passed $3 billion in a quarter for the first time.
Switch speeds moved to 1.6 Tbps, and vendors focused on power savings with linear and co-packaged optics.
Cluster size is increasingly limited by the network and by power, not only by the accelerators themselves.
- The network decides how large an AI cluster can usefully be.
- Switch silicon and custom accelerators are concentrated in a few U.S. companies.
- Power efficiency is becoming the main design goal for AI networks.
Common misreadings
MythAI spending is all about GPUs.
RealityBroadcom's AI revenue, from custom accelerators and networking, rose 221% to $16.7B in one quarter.
MythNetworking is a mature, slow-growth business.
RealityArista's Q2 2026 revenue rose 37.7% year on year.
MythOnly one vendor's network works for AI.
RealityArista sells Ethernet AI fabrics, while Nvidia bundles its own Spectrum-6 switches with Vera Rubin.
MythNetwork power use is negligible.
RealityArista says linear optics cut interconnect power by about 60%.
Cluster size, standards and power: scenarios
| Scenario | Main effect | How it passes through |
|---|---|---|
| Clusters keep growing | Switch and optics demand | More ports and faster speeds |
| Open Ethernet standards win share | Switch vendors | More competition with proprietary platforms |
| Co-packaged optics adopted | Switch design | Lower power, new supply chain |
| Multi-site training spreads | Scale-across | Demand for long-distance links |
| Power limits tighten | Data center design | More focus on efficient networking |
| AI capex slows | Orders | Network spending falls with accelerators |
Supply and demand by segment
| Segment | Supply rigidity | Concentration | New demand | Policy role | What to watch |
|---|---|---|---|---|---|
| Switch silicon | High (design cycles) | Very high | Yes | High (export controls) | New chip launches |
| Switch systems | Medium | High | Yes | Medium | Revenue, guidance |
| Copper cables and connectors | Medium | Medium | Yes (scale-up) | Medium (tariffs) | Rack designs |
| Optics | High (lasers) | High | Yes | Medium | 1.6T adoption |
Supply rigidity: how long new capacity takes and whether money can speed it up. Concentration: whether output sits in a few countries or companies. The more rigid and concentrated, the more prone to shortages.
How to track it
| Indicator | What it tells you | Where to find it |
|---|---|---|
| Broadcom AI semiconductor revenue | Custom accelerators and networking | Broadcom quarterly results, free |
| Arista revenue and guidance | Ethernet AI networking demand | Arista quarterly results, free |
| Hyperscaler capex | AI cluster budgets | U.S. view: AI compute |
| Optical modules | Links inside the network | U.S. view: optical modules |
Sources
- Broadcom: third quarter fiscal 2026 results, SEC filing (2026-09-02)
- Arista Networks: second quarter 2026 results, SEC filing (2026-08-04)
- StorageNewsletter: Nvidia fiscal Q2 2027 results (2026-08-27)
Last updated 2026-10-18.