Nuclear Power and Uranium Industry Explained: The U.S. View
The United States has 94 operating nuclear reactors at 54 plants with about 98 gigawatts of capacity, supplying about 18% of U.S. electricity in 2025 and running 91% of the time on average. The fleet is old, averaging about 44 years, and the newest unit, Vogtle 4 in Georgia, started in April 2024. Demand for reliable power is reviving interest: owners are uprating existing reactors and restarting closed ones such as Palisades in Michigan, which began loading fuel in late August 2026. The fuel chain is the weak point. U.S. reactor operators bought 46.9 million pounds of uranium in 2025, at an average of $58.46 a pound, but U.S.-origin material made up only 7% of deliveries; Canada supplied 32%, Kazakhstan 28% and Australia 15%. Domestic mining is recovering, to about 2.1 million pounds in 2025, the most since 2017. Enrichment is the tighter bottleneck: a 2024 law bans imports of Russian enriched uranium, with waivers allowed only until January 1, 2028.
- Fleet
- EIA: 94 U.S. reactors, about 98 GW, about 18% of power in 2025
- Fuel imports
- U.S.-origin uranium was 7% of 2025 deliveries to U.S. reactors
- Russia ban
- Waivers for Russian enriched uranium imports end by January 1, 2028
How the chain works
Existing reactors, restarts and new builds
| Existing fleet | Restarts and uprates | New reactors | |
|---|---|---|---|
| Scale | 94 reactors, 98,441 MW (EIA, March 2026) | Palisades in Michigan loading fuel since Aug 2026 | Vogtle 4 was the last to start, April 2024 |
| Timeline | Running now | One to a few years | Many years |
| Main risks | Age, fuel supply | Technical delays | Cost overruns, licensing |
| What to watch | Capacity factor, license extensions | Restart dates | Orders and NRC approvals |
An old fleet running hard
According to the EIA, the U.S. had 54 nuclear plants with 94 operating commercial reactors in 28 states as of March 2026, with net summer capacity of 98,441 megawatts. Nuclear supplied about 18% of U.S. utility-scale generation in 2025, behind natural gas at 41% and ahead of coal at 17%.
The reactors run almost all the time: the average capacity factor was 91% in 2025, higher than any other type of power plant. But the average reactor is about 44 years old, and the EIA projects nuclear's share of generation could fall to 12–15% by 2050 as other sources grow.
Uranium: mostly imported
According to the EIA, U.S. reactor owners and operators bought 46.9 million pounds of uranium (U3O8 equivalent) in 2025, down from 55.9 million in 2024, at a weighted average price of $58.46 a pound, 11% higher. Foreign purchases were 43.5 million pounds. By origin, Canada supplied 32% of deliveries, Kazakhstan 28%, Australia 15% and the U.S. 7%.
Domestic mining is coming back from a very low base. U.S. production of uranium concentrate rose to about 2.1 million pounds in 2025, more than triple 2024 and the most since 2017, and exploratory drilling increased.
Enrichment and restarts
Mined uranium has to be converted and enriched before it becomes fuel. Russia was a notable supplier: about 12% of uranium purchased in the U.S. came from Russia at the time, according to Orrick. The Prohibiting Russian Uranium Imports Act of May 2024 banned imports of Russian low-enriched uranium from August 2024, letting the Energy Secretary grant waivers only until January 1, 2028, and directed $2.72 billion toward U.S. enriched uranium production.
On the reactor side, restarts are the fastest way to add capacity. Holtec began loading fuel at the Palisades plant in Michigan on August 30, 2026, after missing an earlier target of February; it has said it aims to restart in 2026, ahead of a contract to supply power by March 2027. The Energy Department is also lending Vistra about $4.2 billion to upgrade and uprate reactors in Pennsylvania and Ohio.
How the U.S. view differs from the China view
The Chinese version of this page is about the world's fastest-growing nuclear builder: China approves new reactors every year, and its questions are approval pace, equipment makers' order books and securing uranium from Kazakhstan and elsewhere.
The U.S. story is about keeping an old fleet running and rebuilding a fuel chain. New construction is slow and expensive, so restarts and uprates come first, and the urgent supply problem is enrichment once Russian imports end.
2024–2026: replacing Russian fuel, restarting reactors
In 2024 Congress banned Russian enriched uranium imports, with waivers ending by January 2028, and set aside $2.72 billion for domestic enrichment.
Operators kept buying uranium from Canada, Kazakhstan and Australia; U.S. mining tripled in 2025 but still covered only a small share of needs.
Meanwhile restarts moved forward slowly: Palisades missed its February 2026 target and began loading fuel only in late August. Nuclear is valued for reliable power, but every step of the chain takes years.
- Enrichment, not uranium mining, is the tightest part of the U.S. fuel chain.
- Restarts and uprates add capacity faster than new reactors.
- Timelines in nuclear slip often; plan for delays.
Common misreadings
MythThe U.S. mines most of its own uranium.
RealityU.S.-origin material was 7% of 2025 deliveries to U.S. reactors.
MythNuclear's share of U.S. power is growing fast.
RealityIt was about 18% in 2025; EIA projects 12–15% by 2050.
MythClosed reactors can restart in a few months.
RealityPalisades missed its February 2026 target and began loading fuel in August.
MythBanning Russian uranium was a simple switch.
RealityWaivers were allowed until 2028 because alternative enrichment takes years to build.
Fuel, policy and power demand: scenarios
| Scenario | Main effect | How it passes through |
|---|---|---|
| Enrichment capacity lags 2028 deadline | Fuel supply | Higher enrichment prices, tighter supply |
| More restarts and uprates | Nuclear output | More capacity within a few years |
| New reactor orders | Long-term capacity | Equipment and fuel demand later |
| Uranium prices rise | U.S. miners | More domestic output |
| Reactor outages | Power supply | Gas plants fill the gap |
| License extensions approved | Existing fleet | Reactors run past 60 years |
Supply and demand by segment
| Segment | Supply rigidity | Concentration | New demand | Policy role | What to watch |
|---|---|---|---|---|---|
| Uranium mining | High (years to permit) | High (Canada, Kazakhstan) | Low | High | U.S. output, prices |
| Conversion and enrichment | Very high | Very high (few suppliers) | Yes | Very high (Russia ban) | New enrichment capacity |
| Existing reactors | Fixed fleet | Medium | Yes (power demand) | High (NRC licensing) | Capacity factor |
| New reactors | Very high (many years) | High | Yes | Very high | Orders, approvals |
Supply rigidity: how long new capacity takes and whether money can speed it up. Concentration: whether output sits in a few countries or companies. The more rigid and concentrated, the more prone to shortages.
How to track it
| Indicator | What it tells you | Where to find it |
|---|---|---|
| Uranium Marketing Annual Report | Purchases, prices and origins | EIA, yearly, free |
| Domestic Uranium Production Report | U.S. mining output | EIA, quarterly, free |
| Nuclear generation and capacity | Fleet performance | EIA Electric Power Monthly, free |
| Reactor licensing and restarts | Capacity additions | U.S. Nuclear Regulatory Commission, free |
| AI compute | Source of new power demand | U.S. view: AI compute |
Sources
- EIA: The U.S. nuclear industry, Energy Explained (2026)
- EIA: Electricity in the U.S., Energy Explained (2026)
- EIA Today in Energy: U.S. uranium production and purchases in 2025 (2026-08-28)
- Orrick: Prohibiting Russian Uranium Imports Act (2024-05-21)
- American Nuclear Society: Palisades restart status (2026-07-08)
Last updated 2026-10-18.